Skip to Content
Login/Register
Contact Us
HOME
MAPS & REPORT CARDS
PHOTOS & VIDEOS
NEWS & EVENTS
RESOURCES
Learn More
Get Involved
Donate
Muddy Water Watch
Alabama
Protect the rivers of our great state.
North Carolina
Together we can save our waters
Home
»
Groups
»
Catawba Riverkeeper
NC Report Card - 03/05/10 - ID#382
Submitted by
RandyatMIL
on Sat, 03/06/2010 - 11:39pm
Site Information
Date of Site Visit:
Sat, 03/06/2010
Enforcement Office:
Catawba-Charlotte
Site Name:
Polo Club at Mountain Island Lake
Site Location:
4759 Polo Gate Blvd., Charlotte, NC
County/Municipality:
Mecklenburg/Charlotte
Project Owner:
Fankhauser Property Group, Inc.
Type of Project:
Residential
Rain in prior 24 hours:
NO
Waterbodies Onsite:
none
Location:
NC
35° 19' 47.8992" N
,
80° 56' 52.4724" W
1. Registration/Information Posting | 2. Stormwater Appearance
2c. Comments:
unknown
3. Construction Entrance/Exits | 4. Perimeter Controls
3a. Is there enough stone, gravel, or stabilizing material to cover the entrance/exit?:
NO
3b. Are construction materials and equipment being stored away from the entrance/exit?:
YES
3c. Is the road free from dirt tracked from the site?:
YES
3d. Is the construction entrance/exit free from flowing dirty water?:
YES
3d. Comments:
no construction entrance on site
4a. Are perimeter controls present?:
NO
4f. Comments:
no sediment or erosion controls at site
5. Storm Drain and Inlet Protection | 6. Soil Stabilzation and Cover
5a. Are storm drains and inlets protected and in good repair?:
NO
5c. Comments:
silt filter fabric is installed on only one storm drain adjacent to site
6f. Comments:
unknown how long site has been active. recent utility excavation in evidence
7. Sediment Traps, Check Dams and Basins
7e. Comments:
no basins, dams or traps on site
General Comments | Photos
Enforcement Log
With whom have you followed up on this report card?:
Enforcement Agency
If you contacted an enforcement agency, with whom did you communicate?:
Charlotte Erosion Control
Date of enforcement follow-up:
Thu, 03/11/2010
How did you follow up?:
email
Was the enforcement agent familiar with the site?:
unsure
Did the agency respond within 5 days?:
yes
Enforcement Log Notes:
Agent contacted developer and S&EC issues were resolved in 24 hours after contact. Silt fence and construction entrance were installed. See photo above
Login
or
register
to post comments
.
Submitted by
RandyatMIL
on Thu, 03/11/2010 - 11:55am.
.
Login
or
register
to post comments
MY MUDDY WATER WATCH
Help Catawba Riverkeeper monitor our rivers and streams:
You must
register
or
login
in order to post into this watershed organization.
Catawba Riverkeeper Report cards
NC Report Card - 08/06/10 - ID#451
NC Report Card - 05/22/10 - ID#436
NC Report Card - 05/16/10 - ID#425
NC Report Card - 04/01/10 - ID#401
NC Report Card - 04/01/10 - ID#402
NC Report Card - 03/20/10 - ID#397
NC Report Card - 03/14/10 - ID#389
NC Report Card - 03/14/10 - ID#387
NC Report Card - 03/13/10 - ID#388
NC Report Card - 03/05/10 - ID#382
.
.